Acquired a new project bike for the shop. Currently runs great and will be a good platform for future mod testing.
Current Configuration (as of 2/7/2015)
UFO exhaust, nash flash, rear stock signal/tag eliminator, ufo front rad blinkers, drag mirrors, see through clutch and waterpump covers, LEDs inside the scoops, double stack clutch springs, barnett clutch, airbox mod and K&N Filter.
First planned mods:
Muscle Reshaped Front Seat
Exhaust Change
Power Commander V to get more fine tunability to the changes coming on the exhaust.
Mirrors.
Paint (not too big a fan of the silver)
Will need to try and borrow a stock ignition box so I can get some baseline testing done. I do have the stock exhaust parts to reinstall for that.
ALSO, I know some have been wanting to get a 17" wheel mounted up and I think I have that part sorted out too. Just need to get some catia and solid modeling done so i can do the engineering part on it.
The big project I have been putting off will now have to be moved up as well. That's the internal engine build work. Already in work is a +3mm bore, head and cams.
Current Configuration (as of 2/7/2015)
UFO exhaust, nash flash, rear stock signal/tag eliminator, ufo front rad blinkers, drag mirrors, see through clutch and waterpump covers, LEDs inside the scoops, double stack clutch springs, barnett clutch, airbox mod and K&N Filter.
First planned mods:
Muscle Reshaped Front Seat
Exhaust Change
Power Commander V to get more fine tunability to the changes coming on the exhaust.
Mirrors.
Paint (not too big a fan of the silver)
Will need to try and borrow a stock ignition box so I can get some baseline testing done. I do have the stock exhaust parts to reinstall for that.
ALSO, I know some have been wanting to get a 17" wheel mounted up and I think I have that part sorted out too. Just need to get some catia and solid modeling done so i can do the engineering part on it.
The big project I have been putting off will now have to be moved up as well. That's the internal engine build work. Already in work is a +3mm bore, head and cams.